Pursuit Dispatchs 99.5% Lithium Carbonate Samples to Potential Strategic Partners as Feasibility Studies Progress

Pursuit Minerals Ltd (ASX: PUR) (“PUR”, “Pursuit” or the “Company”) is pleased to announce that high- purity lithium carbonate samples have been dispatched to multiple parties as part of its engagement with prospective offtake and strategic partners. The samples were produced from the Company’s 250tpa Pilot Plant in Salta, Argentina, using synthetic brine chemically identical to that of the Rio Grande Sur Lithium Project.


HIGHLIGHTS

  • Final product assays confirm 99.5% lithium carbonate purity, upgraded from pilot output via bench scale processing.
  • Certified samples dispatched to multiple potential offtake and strategic partners for qualification.
  • Feasibility study progressing for low cost, 5,000tpa operation at Rio Grande Sur.
  • Ongoing small batch lithium carbonate production to support offtake qualification while preserving capital discipline in current market conditions.
  • Pursuit continues to advance its dual-pronged growth strategy progressing Rio Grande Sur while accelerating the evaluation of strategic gold, silver, and copper acquisitions in Argentina.
  • Advertisement

Figure 1 – Pursuit’s 99.5% Li₂CO₃ Sample Ready for Dispatch to Potential Offtake Partners

In relation to the dispatch of samples, Pursuit Managing Director & CEO, Aaron Revelle, said:

“Achieving 99.5% lithium carbonate purity is a major technical milestone for Pursuit and a clear demonstration of the capability embedded within our flowsheet, team, and pilot plant infrastructure. It not only validates the compatibility of our process design with Rio Grande Sur brines but also confirms our ability to deliver a consistently high-quality product suited to a wide range of industrial and energy storage applications. Dispatching these samples to potential offtake partners is a critical first step in our commercialisation pathway, enabling product qualification and accelerating engagement with strategic customers in tough market conditions. As we transition into the next phase of development, our focus is firmly on advancing feasibility for our 5,000tpa operation and securing long-term partnerships that will underpin the future production and growth of the Rio Grande Sur Project.”

Initial pilot production at Pursuit’s 250tpa Pilot Plant in Salta successfully produced 15 kilograms of lithium carbonate at 98.9% purity, validating both the compatibility of the Rio Grande Sur brine and the efficiency of the Company’s conventional processing flowsheet. To enhance product quality and simulate potential refinement steps at commercial scale, a portion of this material was further treated at bench scale using fractional crystallisation (FX) and ion exchange (IX) techniques. These post processing steps upgraded the product to 99.5% purity, meeting established benchmarks for technical-grade lithium carbonate.

The final product assays confirm not only the effectiveness of Pursuit’s downstream purification strategy but also the scalability and robustness of its broader flowsheet. This achievement represents a critical milestone on the path to commercial readiness supporting key feasibility assumptions, validating end product quality, and enabling active engagement with prospective offtake partners.

Pursuit is well positioned to undertake additional small-batch production as required to meet partner qualification needs and advance strategic discussions. Furthermore, it demonstrates Pursuit’s capability to produce high-purity lithium carbonate suitable for industrial use, with potential to meet battery-grade specifications through additional refinement.

Click here for the full ASX Release

This article includes content from Pursuit Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

Advertisement

Comments are closed.